{"count":233,"next":"https://ll.thespacedevs.com/2.2.0/config/timelineeventtype/?format=json&limit=10&offset=180","previous":"https://ll.thespacedevs.com/2.2.0/config/timelineeventtype/?format=json&limit=10&offset=160","results":[{"id":199,"abbrev":"Orion Boarding","description":"Flight crew board Orion"},{"id":200,"abbrev":"Hatch Closure","description":"Crew module hatch preps and closure"},{"id":201,"abbrev":"Hatch Seal Checks","description":"Counterbalance mechanism hatch sealpress decay checks"},{"id":202,"abbrev":"Hatch Closeouts","description":"Crew module hatch service panel install/closeouts"},{"id":203,"abbrev":"LAS Hatch Closure","description":"Launch abort system (LAS) hatch closure for flight"},{"id":204,"abbrev":"TPS Scan","description":"Launch director brief – rocket & thermal protection system scan results with the imagery console"},{"id":166,"abbrev":"Pad Closeout","description":"All non-essential personnel leave the launch pad"},{"id":205,"abbrev":"Pad Clear","description":"Closeout crew departs the pad"},{"id":206,"abbrev":"Test Director Briefing","description":"Final test director briefing is held"},{"id":207,"abbrev":"Orion Comms Transition","description":"Transition team to Orion to Earth communication loop following final NTD briefing"}]}