{"count":233,"next":"https://ll.thespacedevs.com/2.2.0/config/timelineeventtype/?format=json&limit=10&offset=130","previous":"https://ll.thespacedevs.com/2.2.0/config/timelineeventtype/?format=json&limit=10&offset=110","results":[{"id":148,"abbrev":"RCT Ignition","description":"Ignition of Roll Control Thrusters"},{"id":149,"abbrev":"CLG Start","description":"Start of Closed Loop Guidance"},{"id":150,"abbrev":"MON Passivation","description":"Start of Mixed Oxides of Nitrogen passivation"},{"id":151,"abbrev":"MMH Passivation","description":"Start of Monomethylhydrazine passivation"},{"id":152,"abbrev":"SES-5","description":"Fifth start of the second engine"},{"id":153,"abbrev":"SECO-5","description":"Fifth cut-off of the second engine"},{"id":154,"abbrev":"Launch Escape Jettison","description":"The launch escape system is no longer needed and is jettisoned."},{"id":155,"abbrev":"CSM Seperation","description":"The Apollo command and service module is seperated from upper stage."},{"id":184,"abbrev":"ICPS LH2 Topping","description":"ICPS LH2 tank topping start"},{"id":158,"abbrev":"Prop Load Preparations","description":"Ground systems preparations for vehicle loading"}]}